TAD SALEN HYDRO POWER PLANT: 3.2 MW

The Lao Government is presently considering a number of small, medium and large –scale hydropower projects for implementation in the near future. The small hydropower project are planed to serve remote and isolated areas of the country. Medium and large-scale are planned to cope with the increasing demand in the principle load centers and mainly to enhance power exports earning of country.

For the development of Tad Salen Small Hydropower Project is the implementation of Hydro Electric power plan to generate electrical power for domestic consumption. The project is in the easternmost of the Savannakhet province along the Laos-Vietnam border . he site has been located on Xe saloun Stream, a small tributary of Xe Samou river which is one of tributary of the Se Bang Hiang river. The generation scheme has proposed as the run-of-river type with the total installed capacity of 3.2 MW. The two units of generation have been recommended to maximize benefit in this development.

The Tad Salen small-scale hydropower project had been carried out by the Hydropower Engineering Consultants (HEC) of Lao PDR in 1995. The conclusion of the study emphasizes the importance of implementing the project with economical feasibility and the feasibility study report performed by Korea International Cooperation Agency (KOICA) in 1997 identified technically feasible project of 3.2 MW. The project was planned to connect to the existing distribution grid for domestic use with the annual energy of 17.3 GWh.

The Tad Salen Small Hydropower Project was proposed to supply electric power and play role as the reserve power source for Xepon and vicinity since the development expansion and economic growth in such area was projected to increase rapidly. It was suspended up to the present. Later on 22nd July 2005 a Memorandum of Understanding (MOU) was signed between the government of the Lao People’s Democratic Republic (GOL) and SCI Electric Manufacturer Co., Ltd. Thailand (SCI). This MOU is the preliminary instrument for the GOL and SCI toward attainment of Project Agreements for the development of the Tad Salen The Tad Salen Small Hydropower Project was proposed to supply electric power and play role as the reserve power source for Xepon and vicinity since the development expansion and economic growth in such area was projected to increase rapidly. It was suspended up to the present. Later on 22nd July 2005 a Memorandum of Understanding (MOU) was signed between the government of the Lao People’s Democratic Republic (GOL) and SCI Electric Manufacturer Co., Ltd. Thailand (SCI). This MOU is the preliminary instrument for the GOL and SCI toward attainment of Project Agreements for the development of the The Tad Salen Small Hydropower Project was proposed to supply electric power and play role as the reserve power source for Xepon and vicinity since the development expansion and economic growth in such area was projected to increase rapidly. It was suspended up to the present. Later on 22nd July 2005 a Memorandum of Understanding (MOU) was signed between the government of the Lao People’s Democratic Republic (GOL) and SCI Electric Manufacturer Co., Ltd. Thailand (SCI). This MOU is the preliminary instrument for the GOL and SCI toward attainment of Project Agreements for the development of the Tad Salen hydropower project.

Project Description

(1)LocationEast of Savannakhet province, 245 km East of Khanthabouri,
the Capital of Savannakhet, close to Vietnam Border
 Longitude16o 44’ 12” N
 Latitude106o29’30” E
(2)Hydrology
 Catchment Area102sq km
 Average Annual Inflow126.49MCM
 90% Firm Flow1.32m3/s
 Design Flood (100 year)845m3/s
 Probable Maximum Flood1,862m3/s
(3)Diversion Weir
 Crest Elevation+527.50m MSL
 Overflown Elevation at Flood+531.10m MSL
 Height4.00m
 Crest Length57.00m
 Flushing Gate
 – Width1.50m
 – Height1.50m
(4)Intake
 TypeSide Location
 Slide gate
 – Number2
 – Width1.80m
 – Height2.00m
(5)Desanding Basin
 Trapped Particles0.20mm
 Dimension
 – Length50.00m
 – Width5.00m
 – Height4.00m
(6)Headrace Canal
 TypeTrapezoidal Concrete Lining
 Dimension
 Section 1
 – Length49.50m
 – Bottom Width2.00m
 – Depth3.10m
 Section 2
 – Length368.00m
 – Bottom Width2.00m
 – Depth2.00m
(7)Fore bay
 – Length46.00m
 – Bottom Width2.00 to 10.00m
 – Depth1.90 to 5.40m
(8)Power house
 LocationOn Right Bank of Xe Saloun River
 TypeReinforced-concrete Structure
 Length22.00m
 Bottom Width10.00m
 Depth9.60m
(9)Penstock
 TypeSteel pipe
 Steel pipe170.00m
 Diameter
 – Primary1.50m
 – After Bifurcation1.10m
 Thickness (max.)11.00m
(10)Power Generation Facilities
 Generation schemeRun-of-river
 Total Installed Capacity3.2MW
 Unit Installed Capacity1.6MW
 Turbine
 TypeHorizontal Francis
 Design Head78.4m
 Unit Design Discharge2.53m3/s
 Unit Design Discharge5.06m3/s
 Rate Revolving Speed750rpm
 Generator
 Generator2
 TypeSynchronous Horizontal Axis
 Output Capacity2,000kVA
 Voltage6.6kV
 Transformer
 Number of Unit2
 TypeOil Immersed (Outdoor)
 Capacity2,000kVA
 Voltage6.6/22kV
 Transformer Line
 Distance22km
 Voltage22kV
 Number of Circuit1
(12)Power generation from
the run-of-river hydropower
3.2Megawatt
(13)Annual energy generation17.02Gigawatt-hour